Process management and optimisation
Describing, measuring and improving work processes by analysing waste, lead time and handover moments and recording the new way of working.
How hrmforce measures this
- Assessment method
- Work sample test · rho 0.33 (SD 0.09)
- hrmforce instrument
- Knowledge test (client-specific), Work sample test
- Competency (50-framework)
- Commitment to Quality
- Trainability
- high
- Demand outlook 2026 to 2030
- rising
The candidate performs a representative work sample under standardised conditions.
Behavioural anchors
| Level | Behaviour at this level |
|---|---|
| N1 Guided | Works according to the recorded process steps and reports steps that do not match daily practice. works under supervision and follows instruction · routine, one variable at a time · own task |
| N3 Proficient | Maps a process with those involved, measures lead time and implements improvements with a measurable effect. sets own approach and seeks input proactively · several variables, some ambiguity · own team or process |
| N5 Leading | Defines the process architecture of the organisation, sets standards for process management and steers improvement programmes across value chains. sets the standard and the policy · strategic, under high uncertainty · organisation, value chain or profession |
N2 and N4 are deliberately not anchored. Raters place them between the anchors, following the O*NET convention.
Underlying skills
These skills inherit the assessment route and the behavioural anchors of this construct.
| T | Skill | Definition | Demand outlook 2026 to 2030 |
|---|---|---|---|
| V | Writing a process description Process documentation | Describes the steps, inputs, outputs, roles and decision points of a work process in a fixed format. | declining |
| V | Drawing a process diagram Process mapping | Puts a process into a diagram with swimlanes and symbols so handovers and decisions become visible. | stable |
| V | Conducting a value stream analysis Value stream mapping | Maps every step, waiting time and stock from customer request to delivery and names the waste. | rising |
| V | Measuring process lead time Lead time measurement | Measures how long a case or order travels through the process and where time is lost. | stable |
| V | Locating a process bottleneck Bottleneck analysis | Determines which step limits the speed of the whole and investigates why that step stalls. | rising |
| V | Defining standard work Standard work | Records the best known working method as a standard so deviations become immediately visible. | stable |
| V | Setting up process indicators Process metrics | Chooses a few measurement points per process for quality, time and cost and arranges periodic measurement. | rising |
| V | Applying lean principles Lean | Recognises forms of waste in the work and removes steps that add no value for the customer. | rising |
| K | Applying Six Sigma DMAIC Six Sigma DMAIC | Runs define, measure, analyse, improve and control to reduce variation in a process. | stable |
| V | Preparing process automation Automation readiness | Determines which manual steps lend themselves to automation and describes the rules for the builder. | rising |