Electrical engineering work
Installs, measures and repairs electrical installations and control systems according to diagrams and safety rules, and makes the installation safe to work on.
How hrmforce measures this
- Assessment method
- Certificate or diploma
- hrmforce instrument
- Knowledge test (client-specific), Work sample test
- Competency (50-framework)
- Accuracy
- Trainability
- high
- Demand outlook 2026 to 2030
- rising
Formal proof of completed education or examination.
Behavioural anchors
| Level | Behaviour at this level |
|---|---|
| N1 Guided | Installs electrical components under supervision according to the diagram and uses the prescribed protective equipment. works under supervision and follows instruction · routine, one variable at a time · own task |
| N3 Proficient | Independently locates a fault in a control system, measures voltage and continuity and repairs it within the safety standard. sets own approach and seeks input proactively · several variables, some ambiguity · own team or process |
| N5 Leading | Draws up the company's electrical work instructions and safety rules and reviews installation designs for compliance with standards. sets the standard and the policy · strategic, under high uncertainty · organisation, value chain or profession |
N2 and N4 are deliberately not anchored. Raters place them between the anchors, following the O*NET convention.
Underlying skills
These skills inherit the assessment route and the behavioural anchors of this construct.
| T | Skill | Definition | Demand outlook 2026 to 2030 |
|---|---|---|---|
| V | Reading an electrical diagram Electrical schematics | Reads a wiring or circuit diagram and derives from it the layout and operation of a control system. | stable |
| T | Programming a PLC PLC programming | Writes and tests a PLC program in ladder logic or structured text for a machine control system. | rising |
| V | Building a control panel Control panel assembly | Mounts components, rail and wiring in a control panel according to diagram and finishes the connections. | stable |
| V | Carrying out a NEN 3140 inspection Electrical safety inspection | Inspects electrical equipment and installations visually and by measurement and records the findings. | stable |
| V | Measuring with a multimeter and clamp meter Electrical measurement | Measures voltage, current and resistance in an installation and judges whether values match the diagram. | stable |
| T | Configuring a variable frequency drive Variable frequency drive | Parameterises a variable frequency drive for an electric motor on speed, ramp time and protection. | rising |
| V | Connecting and managing electric motors Electric motor management | Connects a three phase motor in star or delta, protects it and checks current draw and temperature. | stable |
| V | Isolating and releasing an installation Electrical isolation | Switches off power, verifies absence of voltage, locks off and releases the installation again after the work. | stable |
| V | Measuring earthing and protective measures Earthing measurement | Measures earth resistance, insulation resistance and the operation of the residual current device. | stable |
| V | Troubleshooting a control system Control system troubleshooting | Finds a fault in a PLC control system or fieldbus by comparing inputs, outputs, signals and error messages. | rising |
| K | Applying NEN 1010 when installing Electrical installation standards | Chooses cable size, protection and circuit layout according to the requirements of installation standard NEN 1010. | stable |